IFC Mapper
What if 40 hours of modeling work took just 1 minute?
Load an IFC file, define your mappings once, and let your native components place themselves automatically.
The Problem
That isn’t engineering; it’s copying.
As an engineering subcontractor, your job is to turn architectural designs into something the factory can actually produce. The IFC reference file arrives, but nothing lines up with your internal standards. So your team spends a lot of time recreating elements that already exist in the external model — tracing conduits, re-placing components, redoing geometry that someone else already defined. That is not engineering work. It’s manual data entry, project after project.
The Solution
Load, Map, Build
IFC Mapper changes this. Import any IFC model, tell the system how each external component translates to your native library, and hit run. The tool reads the incoming geometry, identifies every element, and substitutes your own components in the right positions — automatically. Configure the mapping rules once and the application remembers them, so every subsequent project benefits from the same setup.

Standards
Your Standards, Learned
Once your company’s mapping rules are in place, processing a new IFC deliverable becomes nearly instantaneous. Instead of burning days on reconstruction, you review and approve the results while IFC Mapper handles the heavy lifting. Your team stays focused on real engineering decisions, not repetitive tracing.
Video
Key Benefits
Why Engineering Teams Choose IFC Mapper.
Eliminate Manual Re-drawing
No more manually tracing IFC components. IFC Mapper handles the interpretation automatically once mappings are known.
Faster External Data Processing
What used to take 40 hours can be condensed to as little as 1 minute when mappings are already known.
Production-Ready Models, Faster
A more efficient route from incoming IFC files to a complete, manufacturable production model.
IFC Mapper. Map once. Build faster.
Stop repeating work and start scaling it.
See IFC Mapper in action and find out how much time your team can save on every project.